IS 10084 : Part 2 : 2014 : Design of Diversion Works - Criteria : Part 2 Diversion Channel and Open Cut or Conduit in the Body of Dam.

ICS 93.160 WRD 22
Reaffirmed 2018

1 SCOPE

This standard covers the criteria for design of open channel and open cut or conduit in the body of the dam as diversion works.

2 REFERENCES

The following standards listed below contain provisions which, through reference in this text constitute provisions of this standard. At the time of publication, the editions indicated were valid. All standards are subject to revision and parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the standards indicated below.

4410 (Part 12) : 1993 Glossary of terms relating to river valley projects : Part 12 Diversion works (first revision)

12966 (Part 2) : 1990 Code of practice for galleries and other openings in dams: Part 2 Structural design

13912 : 1993 Closure of diversion channel and open cut or conduit in the body of the dam — Code of practice

14815 : 2000 Design flood for river diversion works — Guidelines