IS 12800 : Part 2 : Sec 1 : 1989 Guidelines for selection of turbines, preliminary dimensioning and layout of surface hydro-electric power house Part 2 Pumped storage power houses

UDC 621.224.7 : 627.8.091.3 : 621.311.21 WRD 15
Reaffirmed 2021

1 Scope

1.1 This standard (Part 2/Sec 1) lays down guidelines forselection of reversible pump turbine, preliminary dimensioning andlayout of pumped storage power houses for Francis reversibleturbine. However, it does not deal with multistage pumping.

2 References

IS 4410 : Part 10 :1987 Glossary of terms relating to river valleyprojects:Part 10 Hydro-electric power station includingwater conductor system

IS 7418 :1974Criteria for design of spiral casing (concreteand steel)

IS 4461 :1976Code of practice for joints in surfacehydro-electric power station