IS 15284 : Part 2 : 2004 Design and Construction for Ground Improvement - Guidelines - Part 2 : Preconsolidation Using Vertical Drains

ICS 93.020 CED 43
Reaffirmed 2020

1 Scope

This standard (Part 2) covers the guidelines for design and constructionof vertical drains used for improving the ground such that theconsolidation under preload is accelerated resulting in improvement ofground to carry envisaged loads.

2 Reference

IS 1892 : 1979 Code of practice for subsurface investigations for foundations