IS 15446 : Part 2 : 2004 Guide to Production Control - Part 2 : Production Programming
ICS 03.100.50 | MSD 4 |
|
Reaffirmed 2014 |
1 Scope
This standard (Part 2) gives guidance on production programming and itsrelationship to corporate and business programmed and planning techniquessuch as master production schedules and capacity planning.
2 References
IS 15446 Guide to production control:
Part 1 : 2004 Introduction
Part 3 : 2004 Ordering methods
Part 4 : 2004 Dispatching (shop-floor control)
Part 5 : 2004 The relationship between control and other management functions
Part 6 : 2004 Computer aided production control