IS 15446 : Part 3 : 2004 Guide to Production Control - Part 3 : Ordering Methods

ICS 03.100.50 MSD 4
Reaffirmed 2014

1 Scope

This standard (Part 3) gives guidance on ordering in all types ofproduction industry ranging from the simplest to the most complicated caseof engineering multi-product batch production. It describes the decisionsto be made and the systems and methods that can ensure that these decisionto be made and the systems and methods that can ensure that thesedecisions are made efficiently. A number of ordering systems are describedtogether with their applicability. The level of detail is sufficient toguide the readers on the choice of a system or systems appropriate totheir industry.

2 References

IS 15446 Guide to production control:

     Part 1 : 2004 Introduction

     Part 2 : 2004 Production programming

     Part 4 : 2004 Dispatching (shop-floor control)