IS 16115 : 2013 : Evaluation of Completed Irrigation Projects (Major and Medium)-Â Guidelines
Reaffirmed 2024
1 SCOPE
1.1 This standard provides guidance for carrying out the performance evaluation of completed irrigation projects (major and medium) with special emphasis on the irrigation component.
1.2 Evaluation of socio, agro, economic, environmental, ecological, hydropower generation, navigational, flood protection aspects and the assessment of various impacts of the projects on the climate, environment and ecologydo not fall within the scope of this standard.
2 REFERENCES
The following standards contain provisions which, through reference in this text, constitute provisions of this standard. At the time of publication, the editions indicated were valid. All standards are subject to revision, and parties to agreements based on this standard are encouraged to investigate the possibility of applying the most recent editions of the standards listed below:
4410 Glossary of terms relating to river valley projects:
(Part 1) : 1991 Irrigation practice (first revision)
(Part 3) : 1988 River and river training (first revision)
(Part 5) : 1982 Canals (first revision)
(Part 6) : 1983 Reservoirs (first revision)
(Part 12 ) : 1993 Diversion works (first revision)
(Part 15) Canal structures,
(Sec 1) : 1973 General terms
(Sec 2) : 1973 Transitions
(Sec 3) : 1977 Flumes
(Sec 4) : 1977 Regulating works
(Sec 5) : 1992 Cross drainage works (first revision)
(Part 17) : 1977 Water requirements of crops