| IS No. Title |
| IS 4410 | Glossary of terms relating to river valley projects: |
| (Part 1) : 1991 | Irrigation practice (first revision) |
| (Part 2) : 1967 | Project planning |
| (Part 3) : 1988 | River and river training (first revision) |
| (Part 4) : 1982 | Drawings (first revision) |
| (Part 5) : 2023 | Canals (second revision) |
| (Part 6) : 2022 | Reservoirs (second revision) |
| (Part 7) : 1982 | Engineering geology (first revision) |
| (Part 8) : 1992 | Dams and dam section (first revision) |
| (Part 9) : 1982 | Spillways and siphons (first revision) |
| (Part 10) : 1988 | Hydro-electric power station including water conductor system (first revision) |
| (Part 11) | Hydrology, |
| (Sec 1) : 1972 | General terms |
| (Sec 2) : 1972 | Precipitation and runoff |
| (Sec 3) : 1973 | Infiltration and water losses |
| (Sec 4) : 1973 | Hydrograph |
| (Sec 5) : 1977 | Floods |
| (Part 12) : 1993 | Diversion works (first revision) |
| (Part 14) | Soil conservation and reclamation, |
| (Sec 1) : 1977 | Soil conservation |
| (Sec 2) : 1977 | Reclamation |
| (Part 15) | Canal structures, |
| (Sec 1) : 2023 | General terms (first revision) |
| (Sec 2) : 2023 | Transitions (first revision) |
| (Sec 3) : 1977 | Flumes |
| (Sec 4) : 1977 | Regulating works |
| (Sec 5) : 2023 | Cross-drainage works (second revision) |