IS 9401 : Part 13 : 1992 Method of measurement of works in river valley projects (Dams and appurtenant structures): Part 13 Earth and fill dams
UDC 627.824 : 626.1 : 69.003.12 | WRD 23 |
|
Reaffirmed 2022 |
1 Scope
1.1 This standard (Part 13) covers the method for measurement ofearth and fill dams.
2 References
IS 9401 : Part 1 :1982 Method of measurement of works in rivervalleyprojects (Dams and appurtenant structures):Part 1 Excavation for foundation
IS 9401 : Part 2 :1982 Method of measurement of works in rivervalleyprojects (Dams and appurtenant structures):Part 2 Dewatering
IS 9401 : Part 3 :1980 Method of measurement of works in rivervalleyprojects (Dams and appurtenant structures):Part 3 Grouting
IS 9401 : Part 6 :1984 Method of measurement of works in rivervalleyprojects (Dams and appurtenant structures):Part 6 Ventilation pipes and other embeddedmaterials
IS 9401 : Part 8 :1985 Method of measurement of works in rivervalleyprojects (Dams and appurtenant structures):Part 8 Instrumentation